Pre-construction support from RIBA Stage 2 for a 282-home, multi-block residential development of up to six storeys in Manchester.
Scribe focused on cost planning, value engineering, programming and risk management, developing a validated budget and programme while testing the delivery strategy against a constrained site and phased construction requirements.
Particular consideration was given to site logistics, sequencing and maintaining workable construction space, with the development also constrained by its canal-side location and relationship with the adjoining Brunswick Mill site.
The project is currently on hold while the site is used to support logistics for the wider Brunswick Mill development.
Sector: Residential | Value: £60m | Role: Quantity Surveyor
Client: Arrowsmith Group Ltd
Location: Bradford Road, Manchester
Delivery Method: TBC