The refurbishment of an existing open steel canopy to form a storage and operational warehouse, within the client’s live working environment.
Retention and upgrading of the existing canopy structure including: localised repairs and integration with new works, relaying of new level slab, removal and renewal of existing services, new structural steel, wall cladding, roller shutters, and hardstanding repairs.
Sector: Industrial and Logistics | Value: £0.5m | Role: Main Contractor and Principal Contractor
Client: T.EN Advanced Materials and Catalysts UK Limited
Location: Bank Quay, Warrington
Role: Principal Contractor
Delivery Method: Design & Build